Targa Benzene Saturation Unit

Audubon Engineering Solutions performed a FEED, EPC (engineering and design, procurement, and construction), and automation and control for the installation of facility which received a low sulfur natural gasoline stream and converted the benzene to cyclohexane to meet product specifications.  The unit was installed at Targa Resources’ Mont Belvieu Facility.    

 Project Overview: 

  • Benzene Saturation Process 
  • Saturate/Hydrogenate low sulfur natural gasoline and convert benzene to cyclohexane 
  • Fractionation 
  • Absorption / Product Treating 
  • Reactor Design  
  • Product Transfer Pumps & Metering 
  • Plant Utility Integration (Flare, drain, power, instrument air) 
  • Brownfield Expansion 

Scope of Work: 

  • Project Management 
  • Procurement 
  • FEED Engineering 
  • Detail Engineering & Design 
  • Automation and Control 
  • Construction 
  • Process Safety Analysis