Featured projects

FEATURED PROJECTS Where Experience, Expertise, and Execution Intersect


Close

Gulfstar Standard Design

Location: Gulf of Mexico (GOM)
Client: Williams

Audubon Engineering Solutions provided topsides engineering support and modifications to Williams’ proposed Gulfstar Standard Design, a spar-based floating production system. Additional services included conceptual design, front-end engineering design (FEED), and project management. The Gulfstar Standard Design is a classic spar hull with traditional three-level topsides. Its design is based off of the Gulfstar 1, the first spar-based FPS with major components built in the U.S.

Project overview:

  • Topsides modifications of greenfield project
  • Spar-based floating production system
  • All production via subsea wells
  • Design capacities:
    • 60,000 BOPD
    • 120 MMSCFD
    • 40,000 BWPD
  • One departing oil and one departing gas sales pipeline
  • Designed to USCG & BSEE regulations

Project scope:

  • Conceptual design
  • Front-End Engineering Design (FEED)
  • Project management
  • Multidiscipline topsides engineering
Close

NGL Storage Facility

Location: Brazoria County, TX
Client: A Major Oil & Gas Manufacturing and Logistics Company

Audubon Engineering Solutions’ scope of work included process design and engineering  for the facility’s topsides, Total Installed Cost (TIC) estimating, P&IDs, and PHA and LOPA reviews. Additional services included performing a Front-end Engineering Design (FEED) study to determine the scope of work and EPC schedule, and risk register for the entire project. Completion on the 7.5 MMbbl NGL storage project was accelerated and completed within 12 months.

Project overview:

  • 5 underground NGL salt-dome storage caverns
  • Brine de-gasification system
    • 9,200 GPM of brine flow
  • Over  1 mile of pipeline
  • 6 million barrels for underground  NGL storage
  • 2 motor control center (MCC) buildings
  • Bidirectional product manifold system for 5 pipeline tie-ins
  • Design capabilities:
    • 7.5 MMbbl of NGL
    • Cavern depth: 4,500 ft.

Project scope:

  • Facilities topsides design
  • Process design
  • Civil/Structural engineering
  • Total Installed Cost (TIC) estimating
  • PHA & LOPA reviews
  • Brine injection and transfer pumps
  • Automated bi-directional manifold system
  • Product pipeline tie-ins
  • Electrical and control system design
Close

Bayamon Products Terminal

Location: Bayamon, Puerto Rico
Client: Puma Energy Caribe, LLC

Audubon Engineering Solutions performed multidiscipline engineering design for Phase I of a 4 million barrel storage terminal. The design included storage tanks, piping and pumping systems, fire protection, and support services. Audubon Engineering Solutions designed the truck loading facility and pipeline connections to connect the storage facility to a marine terminal. The Audubon Engineering Solutions team was based in Covington and Metairie, Louisiana and closely coordinated with on-site contractors in Puerto Rico to successfully execute design interface and maintain schedule.

Project overview:

  • 4 million barrel storage
  • 3,000,000 BBL
  • Capacity: 517,000 cbm
  • Storage system tied to central manifold
  • Controlled by tank management system

Project scope:

  • Multidiscipline detail engineering design
  • Schedule coordination
  • Storage tanks
  • Piping and pumping systems
  • Fire protection system design
    • For dock and terminal facilities
  • Truck loading facility design
  • Pipeline connections to marine terminal
Close

Explorer Irving Station: Pipeline Installation Services

Location: Irving, Texas
Client: Explorer Pipeline

Audubon Field Solutions provided pipeline installation services for the Explorer Irving Station project. The project scope included topographic and boundary surveying, permitting, right of way acquisition, construction staking, pipe tally and weld mapping, and as-built surveying. The 2,220 foot pipeline connects from the Explorer Irving Station to a major exploration and production company facility. Completed with a critical path approach, the successful project was performed on time and within budget.

Project Overview

  • New pipeline installation
  • 8” pipe stretching 2,200 feet
  • Two perpendicular drills
  • Multiple permitting agencies and land owners

Project Scope

  • Topographic and boundary surveys
  • Permitting
  • Right of way
  • Construction staking
  • Pipe tally and weld mapping
  • As-built survey
Close

Vermillion 272A Platform Design

Location: Gulf of Mexico (GOM) VR-272A
Client: LLOG Exploration Co.

Audubon Engineering Solutions provided engineering, design, procurement, and project support services for LLOG Exploration Co.’s Vermillion 272A platform. The facility serves as an area hub and processing facility for a group of platforms in the Vermillion Bay area. It was designed to serve as the local host for three separate drilling centers and handles 100MMscf/d of natural gas and 5,000 bbl of oil.

Project Overview

  • Water depth: 177 ft
  • Gas rate: 60 MMSCFD
  • Condensate rate: 5 BBL/MM
  • Water rate: 2,500 BPD
  • Oil rate: 5,000 BPD
  • Living quarters
  • Compression

Project Scope

  • Topsides structural engineering
  • Process engineering
  • Mechanical engineering
  • I&E engineering
  • Process and mechanical design
  • Project management
  • Automation engineering
  • Start-up and commissioning assistance
Close

Mandy Development/Matterhorn Tension-Leg Platform

Location: Gulf of Mexico (GOM), MC-199 and MC-243
Client: LLOG Exploration & W&T Offshore

Audubon Engineering Solutions provided topsides engineering support and modifications to W&T Offshore’s Matterhorn TLP production system and integrated the system with LLOG Exploration’s Mandy development and topsides equipment. Topsides facilities modifications were completed to receive, separate, and meter Mandy production prior to commingling with existing Matterhorn production. Our engineering, design, and installation services supported two risers to tie back three Mandy wells that were combined into a 4-slot subsea manifold prior to flowing to the Matterhorn TLP.

Project Overview

  • Brownfield topsides modifications
  • Deepwater floating installation
  • ABS interface for safety systems expansion
  • Additional Mandy development capacities:
    • 20,000 BOPD
    • 12 MMSCFD
  • Mandy Development – in 2,446 ft of water, MC-199
  • Matterhorn TLP – in 2,789 ft of water, MC-243

Project Scope

  • Specification and design of the Mandy production systems
  • Removal of existing equipment and piping
  • Expansion of the fire water and safety systems
  • Design for capacity of existing topside systems to support Mandy production
  • Integration of Mandy subsea equipment with Matterhorn topside systems
  • ABS and USCG permitting support
  • Design of a temporary deck extension and installation plan
Close

Walker Ridge Gathering System: Integrated Topsides Facility

Location: Gulf of Mexico (GOM), Ship Shoal 332A
Client: Enbridge Offshore Facilities, LLC

Audubon Engineering Solutions’ scope of work included the detailed engineering for the topsides facilities, structural design of the module, local platform verification, pipeline interface, process automation, platform piping, electrical and utility interconnects. Additional services involved overseeing the project management through startup. Audubon Engineering Solutions also provided the Front-end Engineering Design (FEED), procurement and construction support as well as startup and commissioning. Our staff also oversaw measurement, compression, gas dehydration and motor control center (MCC)/control building for a new multi-level process module.

Project Overview

  • Project management of topsides integration
  • Detail design, procurement, and construction support
  • Water depth is approximately 450 ft
  • Design capabilities:
    • Exporting mode: 100 MMSCFD
    • Importing mode: 18 MMSCFD; 460 BHP

Project Scope

  • Front-end Engineering Design (FEED)
  • Sensitivity study
  • Commissioning and startup
  • Coordination of pipeline interface
  • Detailed design of new multi-level process module
  • Platform piping, electrical, and utility interconnects design
  • Structural design of module and local platform verification
  • Process automation
Close

Beckville Plant: Cryogenic Processing Plant

Location: Panola County, Texas
Client: Midcoast Energy Partners, LP, an Enbridge Company

Audubon Field Solutions provided technical writing services for commissioning and startup procedures as well as operating procedures for the Beckville Plant. Initially, the project began with a commissioning manager, I&E technician, and a junior commissioning technician provided by Audubon Field Solutions. The scope of work also included the management of third-party personnel, schedule coordination, communications, and procurement of third-party work.

Audubon Engineering Solutions supported engineering efforts in several disciplines, including civil, structural, mechanical, electrical, and instrumentation.

Project Overview

  • 40-acre cryogenic processing plant
  • Field and technical writing services
  • Design capabilities: 150 MMCFD (natural gas), 6900 BPD (NGLs)

Project Scope

  • Detailed engineering and design
  • Commissioning and startup
  • PSM-compliant operations procedures
  • Construction management and inspection
  • Third-party personnel management
  • Procurement of third-party work
Close

Permian Express II Pipeline Construction Inspection

Location: Colorado City, TX to Corsicana, TX
Client: Sunoco Logistics Partners, LP

Audubon Field Solutions performed the construction inspection for the Permian Express II project.The scope of work also included personnel management services to provide a team of inspectors, consisting of 15 utility inspectors, 16 certified welding inspectors, 3 NACE inspectors, one I&E inspector, and one systems management supervisor for each spread. This project consists of five spreads (approximately 60 to 80 miles) that are 20” and 24” pipe lay, including a pig trap station and valve sites for a total of 340 miles. The project will begin in Garden City, TX as a 20” pipeline and run to Sunoco Logistics’ tank terminal in Colorado City, TX. The pipeline will then run as 24” to Sunoco Logistics’ tank facility in Corsicana, TX.

Project Overview

  • 20” and 24” crude pipeline approximately 340 miles long
  • Pipeline construction services

Project Scope

  • Construction inspection
  • Personnel management
Close

Pecos Platform Project Management and Inspection

Location: Pecan Island Field, Vermillion Parish, Louisiana
Client: Freeport-McMoRan

Audubon Field Solutions performed project and construction management, coating inspections, and I&E inspections on the Pecos platform, a single-level 48′ caisson deck with a heliport. The facility was engineered to flow 15 MMSCFD and manage 400 barrels of condensate. The scope of work also included procurement and cost tracking on all phases of the project. The team installed a 6″ pipeline, running from Pecos to Harvest SL-3763. Audubon Field Solutions added a new separator on the Harvest platform to manage production from the Pecos platform and oversaw the offshore installation of the separator, pipeline, caisson deck, and helideck.

Project Overview
  • Single-level 48′ caisson deck with a heliport
  • 6” pipeline approximately 6 miles long
  • Oversight of the caisson deck, helideck, separator, and pipeline installation
  • 15 MMSCFD
  • 400 barrels of condensate
Project Scope
  • Project management
  • Construction management
  • Coating inspections
  • I&E inspections
  • Procurement and cost-tracking
Close

Longhorn/Appaloosa Facilities: Subsea Tieback of Wells

Location: Gulf of Mexico (GOM), MC-365A
Client: ENI U.S. Operating

Our services included project management, procurement, engineering and design, automation, equipment inspection and construction management. Structural analysis was performed to verify the platform’s sustainability for the intended field development. Additional work included the interface between topsides and subsea wells, including support for HPU and TUTA and automation links between the topsides and subsea controls programming. With Audubon Field Solutions, we provided the decommissioning of the existing production module and construction management for onshore and offshore activities.

Project Overview

  • Entirely new topsides facility development using the existing platform topsides
  • 4 major topsides modules including a 1,400-ton production module
  • Water depth is approximately 620 ft
  • Design capabilities: 15,000 BOPD, 250 MMSCFD, and 11,400 HP

Project Scope

  • Gas processing, treating, dehydration, compression and export systems
  • Oil processing, treating and export systems
  • Process control and safety system design/integration
  • Electrical power generation
  • Inspection and construction management
  • Integration of subsea systems
Close

Black Bay Facility Central Field Redevelopment

Location: Black Bay, Louisiana
Client: Helis Oil & Gas Company, LLC

Audubon Engineering Solutions’ scope of work included the Front-end Engineering Design (FEED) and detailed design of three 6-pile and one 4-pile, steel-jacketed facilities. Services involved structural design of the decks and jackets, and facility design, including all process, electrical, instrumentation, mechanical and piping design. Additional services included project management, installation supervision, construction management, and commissioning and startup support of the facilities.

Project Overview

  • Fixed platforms
  • Produced water injection 32-man quarters
  • Water depth is approximately 8 ft
  • Design capabilities: 6,000 BOPD, 50 MMSCFD, and 80,000 BWPD
  • Designed to GOM standards

Project Scope

  • Compression
  • Gas dehydration, gas lift system, and gas sales
  • De-sanding and de-oiling hydrocyclones
  • Separation, oil treating and dehydration
  • Lease Automatic Custody Transfer (LACT)
  • Construction management
Close

Corvina CX-15 Development: Drilling and Production Platform

Location: Block Z-1, Peru
Client: BPZ Exploración & Producción S.R.L.

Audubon Engineering Solutions provided multidisciplinary engineering design for the Corvina CX-15 drilling and production platform’s three-level topsides. Our topsides drafting/design team utilized PIERS™ conceptual methodology to explore six block development options. Additional work included Front-end Engineering Design (FEED), detail engineering through offshore commissioning and start-up. Our procurement department collaborated with BPZ Energy to procure and inspect all of the topsides equipment. Cimation, an Audubon Companies affiliate, handled automation and commissioning support of the topsides equipment and hull interfaces.

Project Overview

  • Greenfield development in seismically active location
  • 24-slot well bay
  • Water depth is approximately 170 ft
  • Design capabilities: 12,000 BOPD, 12.8 MMSCFD, 3,500 BWPD
  • Designed to GOM and Peruvian regulations

Project Scope

  • Process control and safety system design and integration
  • Electrical systems design
  • Import/export flowline and riser design
  • Procurement of all topsides equipment
  • Hull and subsea well interface
  • Automation and integration of topsides equipment
Close

Delta House FPS Semi-Submersible Platform

Location: Gulf of Mexico (GOM), MC-254
Client: LLOG Exploration Co. LLC

Audubon Engineering Solutions’ scope of work for Delta House, an independent, semi-submersible floating production system (FPS), included multidisciplinary engineering design for the platform’s topsides. Our topsides drafting/design team utilized PDMS software to develop a complete production facility model. Our procurement department collaborated with LLOG Exploration Co. LLC’s purchasing staff to procure all of the topsides equipment.

Project Overview

  • Water depth is approximately 5,000 ft
  • All production is via subsea wells
  • Design capabilities: 80,000 BOPD, 200 MMSCFD and 40,000 BWPD
  • One departing oil and one departing gas sales pipeline
  • Designed to USCG and BSEE regulations
  • DNV is the classifying agency on the hull and CVA on the topsides

Project Scope

  • Regulatory interface and compliance (DNV & BSEE)
  • Automation & integration of topsides equipment
  • Procurement of all topsides equipment
  • Hull and subsea well interface
  • Topsides weight control
  • Process safety analysis
Close

Bayou Carlin

Location: St. Mary Parish, Louisiana
Client: McMoRan Oil & Gas LLC

The Audubon Field Solutions team performed project management, construction management, I&E inspection and paint inspection.  Scope of work also included cost tracking, writing PO’s, procurement of materials and vendor surveillance.  Our staff out-fitted a 195 x 35 barge with equipment to produce 50 mcfd. We oversaw installation on the 8″ pipeline with two underground bores: one at 4,800 and the other at 3,000. Total length of the line was 18,000 feet.

Close

T14 Fractionation Plant

Location: Mount Belvieu, TX
Client: Targa Resources

Audubon provided detail design, engineering and procurement to assist Targa Resources with expanding the capacity of its Cedar Bayou Fractionators, L.P. natural gas liquid fractionation facility. The maximum gross fractionation capacity of the facility was expanded by 28% to 275,000 BDP, an increase of 60,000 BDP. Audubon achieved an increase of 88,000 BDP for the client, placing us ahead of schedule and budget.

Close

Keota LNG Plant

Location: Colorado
Client: Noble Energy

Audubon provided the Engineering, Procurement, and Construction (EPC) for the Noble Energy Keota Gas & Liquefied Natural Gas (LNG) Plant in rural northern Weld County.  The project is one of the largest and most important facilities for Colorado with the first LNG plant in the state.  The facility includes condensate stabilization, inlet compression, amine treating, cryogenic natural gas liquids (NGL) recovery, product storage, residue compression, and an LNG facility.

Close

Cove Point LNG Project

Location: Maryland
Client: Dominion

Audubon Engineering Solutions serves as Owner’s Engineer for the Dominion Cove Point LNG engineering and construction project on Chesapeake Bay. The liquefaction facilities will provide a bi-directional service of import and export of LNG at the Dominion Cove Point LNG Terminal. The proposed facility is designed to process an average of 750 million standard cubic feet per day of inlet feed gas. The facility is designed to generate additional power on site to meet the power demands of the liquefaction plant. The liquefaction facilities will connect with the existing facility and share common facilities such as the LNG tanks, pumps, piping and pier in order to import and export LNG.

Close

Davy Jones I & II Central Process and Satellite Facilities

Location: Gulf of Mexico (GOM), SMI-230 & SMI-234
Client: McMoRan Oil and Gas

Audubon Engineering Solutions performed the Front-end Engineering Design (FEED), detailed design, procurement, construction support, startup and commissioning for McMoRan’s greenfield central process and satellite facilities. Our staff provided the structural design of various project elements, including jackets, decks, flare booms and heliports. The scope of work also included process modeling, equipment sizing and design, electrical engineering, instrument design, high temperatures and pressures, high CO2 and H2S concentrations and associated amine treating. Audubon Engineering Solutions also collaborated with the well design team on process and interface issues.

Audubon Field Solutions provided services for the 4-pile and 8-pile jackets and decks of the facilities, including construction management, paint inspection I&E inspection, onsite cost tracking and material tracking, as well as HSE oversight. Additionally, the project team oversaw the 12″ pipeline installation and performed vendor surveillance in the fabrication shops where we handled the skid packages, vessels and ICP for the deck installation and reviewed all onshore and offshore welding procedures.

Project Scope

  • Front-end engineering design (FEED) and detail design
  • Startup and commissioning
  • Project and construction management
  • Paint inspection and I&E inspection
  • Total Installed Cost (TIC) control
  • Procurement and expediting
Close

Cherokee Pipeline Replacement

Location: Glenpool, OK to Mt. Vernon, MO
Client: A Major Liquids Pipeline and Refining Company

Audubon Field Solutions provided survey, mapping, and right of way services to assist with the replacement of a 10″ pipeline from Glenpool, OK to Mt. Vernon, MO — a total of 272 miles. Our team played an integral role in supporting the Engineering Team during the Front-end loading (FEL) phase to final as-built documentation. Audubon Field Solutions was responsible for the preliminary survey, right-of-way assistance, routing, construction staking, construction alignment sheet preparation, as-built survey, and as-built alignment sheet documentation, as well as providing geographical information system (GIS) data to be loaded into the Pipeline Open Data (PODS) GIS database.

  • 10″ pipeline stretching 272 miles
  • Survey, mapping, and right of way services
  • Front-end loading (FEL) phase to final as-built documentation support
Gulfstar Standard Design
Location: Gulf of Mexico (GOM)
Client: Williams
NGL Storage Facility
Location: Brazoria County, TX
Client: A Major Oil & Gas Manufacturing and Logistics Company
Bayamon Products Terminal
Location: Bayamon, Puerto Rico
Client: Puma Energy Caribe, LLC
Explorer Irving Station: Pipeline Installation Services
Location: Irving, Texas
Client: Explorer Pipeline
Vermillion 272A Platform Design
Location: Gulf of Mexico (GOM) VR-272A
Client: LLOG Exploration Co.
Mandy Development/Matterhorn Tension-Leg Platform
Location: Gulf of Mexico (GOM), MC-199 and MC-243
Client: LLOG Exploration & W&T Offshore
Walker Ridge Gathering System: Integrated Topsides Facility
Location: Gulf of Mexico (GOM), Ship Shoal 332A
Client: Enbridge Offshore Facilities, LLC
Beckville Plant: Cryogenic Processing Plant
Location: Panola County, Texas
Client: Midcoast Energy Partners, LP, an Enbridge Company
Permian Express II Pipeline Construction Inspection
Location: Colorado City, TX to Corsicana, TX
Client: Sunoco Logistics Partners, LP
Pecos Platform Project Management and Inspection
Location: Pecan Island Field, Vermillion Parish, Louisiana
Client: Freeport-McMoRan
Longhorn/Appaloosa Facilities: Subsea Tieback of Wells
Location: Gulf of Mexico (GOM), MC-365A
Client: ENI U.S. Operating
Black Bay Facility Central Field Redevelopment
Location: Black Bay, Louisiana
Client: Helis Oil & Gas Company, LLC
Corvina CX-15 Development: Drilling and Production Platform
Location: Block Z-1, Peru
Client: BPZ Exploración & Producción S.R.L.
Delta House FPS Semi-Submersible Platform
Location: Gulf of Mexico (GOM), MC-254
Client: LLOG Exploration Co. LLC
Bayou Carlin
Location: St. Mary Parish, Louisiana
Client: McMoRan Oil & Gas LLC
T14 Fractionation Plant
Location: Mount Belvieu, TX
Client: Targa Resources
Keota LNG Plant
Location: Colorado
Client: Noble Energy
Cove Point LNG Project
Location: Maryland
Client: Dominion
Davy Jones I & II Central Process and Satellite Facilities
Location: Gulf of Mexico (GOM), SMI-230 & SMI-234
Client: McMoRan Oil and Gas
Cherokee Pipeline Replacement
Location: Glenpool, OK to Mt. Vernon, MO
Client: A Major Liquids Pipeline and Refining Company
Benchmark Projects